Founding offer · lifetime membership for a single £24, exclusive to our first members · closes 20 June Claim your place →
Global Research Partnerships £24 Lifetime Log inCreate free account

Funded Projects › H2020

SMARTUNNEL · The longest-life & energy-saving emergency LED lighting system for underground infrastructures

H2020Status: CLOSED1 November 201828 February 2019EU funding €50,000Call H2020-EIC-SMEInst-2018-2020

During rail and road tunnel construction/refurbishment, the initial investment required for lighting system installation, including emergency lighting systems (ELS) amounts to an average 6% of total tunnel construction cost. Current ELS power supply circuits force lights to remain on for long hours when not needed: when power is turned off manually, existing circuits keep ELS on (powered by batteries). This leads to needless energy consumption and fast battery deterioration. We, at Uni-light LED, have developed Smartunnel, a new smart LED ELS for tunnels under construction/refurbishment, which turns off when light is not needed. Our smart switch and intelligent control allow discrimination between unintentional power outage and intentional interruption, so that emergency lights are lit only under the first scenario. This prevents excessive battery exhaustion/recharging cycles thus making Smartunnel the longest-life ELS on the market (10 years, 80% reduction in battery waste). Smartunnel offers 20-30% increased energy efficiency leading to effective savings of €13,000/3km per year. Our flicker-free and electromagnetic interference-free lights improve visibility and reduce health issues, enhancing safety and security for tunnel workers. Conveniently, Smartunnel can use existing wiring installations to power emergency lights, curbing the cost of new wiring in existing tunnels. We already commercialise 7 lighting product types, based on our patented LED light Driver and Thermal Management Technology for illumination in agriculture, industry and on ships, thus far reaching 100 companies in the UK, Sweden, Germany and Austria. The success of our existing systems has funded Smartunnel development. Following the optimisation of our design into a pilot for phase 2 validation under real conditions. We aim to achieve a tunnelling construction market share of 21 % in Europe as well as 8 % in USA by 2024, creating at least 20 new jobs at Uni-light LED in the process.

Consortium · 1 organisation

coordinator

A UNI LIGHT LED AB

SE · €50,000

Research fields

View the official record on CORDIS →

← Find collaborators and more funded projects

Source: CORDIS, Publications Office of the European Union. Global Research Partnerships surfaces open EU research data to help you find collaborators; we are not affiliated with the European Union.