Founding offer · lifetime membership for a single £24, exclusive to our first members · closes 20 June Claim your place →
Global Research Partnerships £24 Lifetime Log inCreate free account

Funded Projects › H2020

SAFTInspect · Ultrasonic inspection solution for railway crossing points

H2020Status: CLOSED1 October 201729 February 2020EU funding €993,518Call H2020-SMEInst-2016-2017

The heart of the rail crossings points also known as “frogs”, are a mechanical installation that enable a train to switch from one track to another.Frogs are subjected to repetitive impact collisions from the rolling stock.Such actions cause fatigue cracking which compromise the structural integrity of these safety critical components.For this reason, the EU infrastructure employs manganese steel at safety critical locations such as crossing.Railway sector involves companies that need to inspect railway crossing accurately and in time.SAFTInspect is the only solution that will warranty the total inspection of the “frog” and it will also monitor the evolution through time with a Data base (Big Data).SAFTInspect is based on a Synthetic Aperture Focussing Technique (SAFT) that facilitates for the first time full volume inspection of railway crossings devices in order to detect flaws on critical parts reinforcing the railway safety regions.SAFTInspect system will improve levels of safety for the railway industry preventing train derailments.Rail operators, underground operators, rail maintenance service providers and manufacturers, will benefit from our SAFTInspect innovative device that will be used both in pre-service and in-service analysis:Pre-service: SAFT Inspect will allow the manufacturer to control every asset produced and to offer a better service to its customers (100% of quality). No special infrastructure is required, no special skills from the user.In-service:Full volumetric inspection is more effective (90%). We will reduce 85% the total time per inspection and 94% on savings from labour costs.Cracks that occur during service will be detected at an early stage in their growth cycle.Therefore, we will eliminate the unnecessary cost of replacing frogs that are not damaged (savings around €1.89M per year). From a global perspective, avoiding unscheduled maintenance, rail operators will save up to €87.5M in penalties in Europe due to train derailments.

Consortium · 2 organisations

coordinator

AIRTREN, S.L.

ES · €631,181

participant

MICROTEST SA

ES · €362,337

Research fields

View the official record on CORDIS →

← Find collaborators and more funded projects

Source: CORDIS, Publications Office of the European Union. Global Research Partnerships surfaces open EU research data to help you find collaborators; we are not affiliated with the European Union.