Funded Projects › FP7
RingMan · Offshore Wind Turbine Towers – A Quicker, Cheaper Flange Supply Route
There is a tendency to higher power offshore wind turbines, leading to larger turbine towers (5m diameter and greater) and a requirement for large diameter connection flanges between the tower sections and between the tower and foundation transition pieces. Currently, forged rings are specified, with inherently high cost and few suppliers worldwide. This leads to long lead times and higher costs for these strategic parts.RingMan will develop an alternative manufacturing route (using lower-cost cold rolled plate) which will enable the fabrication of large diameter wind tower flanges to be undertaken by our SME consortium members.The project will enable the partners to commission:•Development of high quality, low distortion, thick section electron beam welding fabrication and machining to produce flanges from readily available cold rolled steel plate material.•Understanding of the flange property requirements and how these can be met by a fabricated flange leading to design tools to enable wind turbine tower designers to specify these products.•Procedures for inspection that will aim to ensure that the parts manufactured meet or exceed the required performance properties.
Consortium · 7 organisations
SANBORN AS
CZ · €337,417
LULEA TEKNISKA UNIVERSITET
SE · €34,527
AQUASIUM TECHNOLOGY LTD
UK · €353,965
VESTAS WIND SYSTEMS A/S
DK · €64,617
FORJAS IRAETA HEAVY INDUSTRY SL
ES · €54,657
INETEC-INSTITUT ZA NUKLEARNU TEHNOLOGIJU DRUSTVO S OGRANICENOM ODGOVORNOSCU ZA ISTRAZIVACKO RAZVOJNE I KONSULTING USLUGE, PROIZVODNJU I TRGOVINU
HR · €252,837
TWI LIMITED
UK · €34,680
Research fields
← Find collaborators and more funded projects
Source: CORDIS, Publications Office of the European Union. Global Research Partnerships surfaces open EU research data to help you find collaborators; we are not affiliated with the European Union.