PINTA2 · IP1 Traction TD1 and Brakes TD5 – Phase 2

H2020Status: CLOSED1 September 201828 February 2021EU funding €12,680,591Call H2020-S2RJU-2018

The PINTA2 Project (IP1 Traction TD1 and Brakes TD5 – Phase 2) will address the two key topics highlighted in the Shift2Rail Call topic S2R-CFM-IP1-01-2018 – Development of concepts towards the next generation of traction systems and management of wheel/rail adhesion, namely Traction and Adhesion Management. PINTA2 will continue, fully in line with PINTA Phase1, to work on Traction & Adhesion improvements of seven technical and economical KPIs of the Traction system that have been agreed and defined in PINTA (fully in line with S2R KPIs). These performances will be improved on five different train applications having different constraints, needs and specificities, from tramway to HST, including metro, sub-urban, regional trains. In particular, Traction sub-project will address the following KPIs: 1) Line capacity increase through weight, volume and noise savings of Traction equipment. 2) Reduction of Maintenance costs via higher reliability/availability and optimized for maintenance Traction components. 3) Railway system LCC reduction via higher energy efficiency and optimized capital cost of the Traction systems.On Brakes Adhesion side, the work will lead to the achievement of a number of important objectives such as · higherTRL levels of improvement of braking degradation limit in poor adhesion condition · Management of all adhesion conditions in a way that brake distances are optimized · Improvement of the overall train safety, which relies substantially on the management of the wheel/rail contact · Reduction of wheel Life-Cycle-Costs (LCCs) through optimized wheel/rail contact in braking The activities will contribute in developing new performance solutions for Adhesion. The work done in PINTA2 will consist in higher achievement ( up to TRL6) to prepare the final Phase3 work and future TRL7 demonstration on trains, at least Metro, Regional and HST expected around 2021-22.

Consortium · 15 organisations

coordinator

ALSTOM TRANSPORT SA

FR · €6,242,484

thirdParty

DB SYSTEMTECHNIK GMBH

DE

thirdParty

Construcciones y Auxiliar de Ferrocarriles, S.A.

ES

participant

DEUTSCHE BAHN AG

DE · €257,751

participant

ALSTOM RAIL SWEDEN AB

SE · €929,939

thirdParty

CENTRO DE ENSAYOS Y ANALISIS CETEST SL

ES

participant

CAF POWER & AUTOMATION SL

ES · €1,774,138

participant

PATENTES TALGO SL

ES · €839,916

participant

SIEMENS MOBILITY GMBH

DE · €1,399,888

participant

KNORR-BREMSE SYSTEME FUR SCHIENENFAHRZEUGE GMBH

DE · €443,936

thirdParty

NOWE GMBH

DE

participant

FAIVELEY TRANSPORT ITALIA SPA

IT · €692,916

participant

SNCF VOYAGEURS

FR · €43,936

thirdParty

KNORR-BREMSE VASUTI JARMU RENDSZEREK HUNGARIA KORLATOLT FELELOSSEGU TARSASAG

HU

thirdParty

CONSTRUCCIONES Y AUXILIAR DE FERROCARRILES INVESTIGACION Y DESARROLLO SL

ES

View the official record on CORDIS →

← Find collaborators and more funded projects

Source: CORDIS, Publications Office of the European Union. Global Research Partnerships surfaces open EU research data to help you find collaborators; we are not affiliated with the European Union.