Founding offer · lifetime membership for a single £24, exclusive to our first members · closes 20 June Claim your place →
Global Research Partnerships £24 Lifetime Log inCreate free account

Funded Projects › FP7

OilEClear · Development of a safe, compact, highly efficient, economic and fully automatic electrolytic treatment system for separation of emulsified oil from wastewater of ships (bilge) and oil rigs (slop)

FP7Status: CLOSED15 November 201214 February 2015EU funding €1,149,000

The project OilEClear will develop a treatment system for oily wastewater at ships and oil rigs, enabling these to meet current and future bilge and slop water regulations with regard to oil hydrocarbons (THC), dissolved organics and toxic metals. OSPAR has set the discharge limit to 30 ppm oil in slop. IMO resolution MEPEC 107(49) sets the limit to 15 ppm oil in bilge, which complies with EU directive MED 96/98/WC. Some countries practice a limit of 5 ppm. With the currently available treatment technologies, it is a great challenge for the ship and rig owners/operators to meet the regulations regarding discharge of oily wastewater. A huge market is therefore open for better alternatives. The OilEClear project aims at a new, patentable electro-coagulation treatment system, meeting a THC standard of 5 ppm which also removes organics and toxic metals. The OilEClear system will separate emulsified oil from water by use of a novel three-phase separator design. Effluent data and operation will be integrated with process control by use of ultrasound measurement of flow and particles and automatic logging and monitoring of THC by UV-fluorescence. The project will be coordinated by Westmatic AB( Sweden). As electrode cell and separation unit technology provider, they will post project sell the fully integrated systems and service to the market. The other project partners in the project include the SME IMU-TEC OY (Finland) who will be apply their knowledge in aerosols cleaning and waste gas from reactor, SME NaCoM AS (Norway) who will contribute with their experience of integration of on-board system for ships and rigs, the end user and LE Stena Line (Sweden) who will contribute with end user requirement guidance and the RTDs Teknologisk Institutt AS (Norway) and Fraunhofer IGB (Germany) who will perform the majority of the RTD work in the project.

Consortium · 6 organisations

coordinator

WESTMATIC I ARVIKA AKTIEBOLAG

SE · €512,313

participant

TEKNOLOGISK INSTITUTT AS

NO · €39,380

participant

FRAUNHOFER GESELLSCHAFT ZUR FORDERUNG DER ANGEWANDTEN FORSCHUNG EV

DE

participant

STENA LINE SCANDINAVIA AB

SE · €59,000

participant

NAVAL CONSULTING AND MANAGEMENT AS

NO · €236,294

participant

OY IMU-TEC AB

FI · €302,013

Research fields

View the official record on CORDIS →

← Find collaborators and more funded projects

Source: CORDIS, Publications Office of the European Union. Global Research Partnerships surfaces open EU research data to help you find collaborators; we are not affiliated with the European Union.