Founding offer · lifetime membership for a single £24, exclusive to our first members · closes 20 June Claim your place →
Global Research Partnerships £24 Lifetime Log inCreate free account

Funded Projects › H2020

GOPV · Global Optimization of integrated PhotoVoltaics system for low electricity cost

H2020Status: CLOSED1 April 201831 March 2023EU funding €9,403,873Call H2020-LCE-2016-2017

Scenarios have forecasted a long lasting amplification with PV electricity becoming the cheapest electricity source in many regions with costs in the range of 4 to 6 c€/kWh for EU by 2024, while 2.2 c€/kWh has been achieved for a 800 MW PV plant planned in Abu Dhabi for 2019.The PV market will continue to expand in the coming years with more than a doubling in the production capacity expected for 2024. At the same time investment in production capacities is foreseen to keep growing hence maintaining the sector highly competitive. For the European PV industry, which is struggling to survive after years of massive investments in China and south-east Asia, the growth of the market represents a chance to come back as a prime player on high-efficiency premium technologies. This is the positioning of GOPV to develop highly competitive technologies for the PV utility market and strong synergies between European players. The project will accelerate reduction of electricity cost implementing advanced PV features and creating synergies across 5 topic areas: Light Management; Energy Efficiency; Material Efficiency; System Reliability; and System configuration and O&M. Ultimately, it will set up an integrated 250 kW PV system to demonstrate a competitive electricity cost of 0.02 €/kWh for irradiation levels of 1900 kWh/m²/year GHI in Southern Europe. The levelised cost of electricity (LCOE) will hence be reduced by 50% (currently 0,04 €/kWh) and the energy payback time reduced by 40%, both in respect to actual standard solution and to PERC best in class mono-facial solution. GOPV project will deliver a 35 years lifetime for the PV string instead of 25 years standards.Beyond GOPV, the global turnover for the six industrial partners exploiting the results of the project will be close to 48 M€ (2022) and will reach 680 M€ in 2027 (x 14 compare to 2020) with an expectation of creating more than 2000 jobs on the 2022-27 period.

Consortium · 13 organisations

coordinator

COMMISSARIAT A L ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES

FR · €2,376,771

thirdParty

3SUN S.R.L.

IT

participant

FUNDACION TECNALIA RESEARCH & INNOVATION

ES · €692,851

participant

CONVERT ITALIA SPA

IT · €1,348,630

participant

MONDRAGON ASSEMBLY SOCIEDAD COOPERATIVA

ES · €569,625

participant

GXC COATINGS GMBH

DE · €363,213

participant

ECOLE POLYTECHNIQUE FEDERALE DE LAUSANNE

CH · €778,429

participant

ENEL GREEN POWER SPA

IT · €1,294,563

participant

REFU ELEKTRONIK GMBH

DE · €495,192

participant

INES PLATEFORME FORMATION & EVALUATION

FR · €170,375

participant

RICERCA SUL SISTEMA ENERGETICO - RSE SPA

IT · €845,563

participant

ACONDICIONAMIENTO TARRASENSE ASSOCIACION

ES · €468,664

thirdParty

ENEL GREEN POWER ITALIA SRL

IT

Research fields

View the official record on CORDIS →

← Find collaborators and more funded projects

Source: CORDIS, Publications Office of the European Union. Global Research Partnerships surfaces open EU research data to help you find collaborators; we are not affiliated with the European Union.