Founding offer · lifetime membership for a single £24, exclusive to our first members · closes 20 June Claim your place →
Global Research Partnerships £24 Lifetime Log inCreate free account

Funded Projects › FP7

GigaWaM · GIGA BIT ACCESS PASSIVE OPTICAL NETWORK USING WAVELENGTH DIVISION MULTIPLEXING

FP7Status: CLOSED1 April 200830 September 2012EU funding €3,000,000

The need for higher speed is a never ceasing requirement for broadband access and requirement of 1 Gbps is expected around 2016. The copper lines are expected to reach their maximum capacity at about 10 Mbps while the capacity required only for watching one channel of HDTV is 20 Mbps.<br/>Tithe total number of homes connected to fibres will grow from about 11 million at the end of 2006 to about 86 million at the end of 2011, dominated by Asia with 59 million household connected.<br/>Our idea is to develop and implement WDM-PON as the new future proof FTTH technology to satisfy the coming BW requirements with a point to point architecture. The aim is to develop application specific optical components of a WDM-PON broadband access network targeting a system cost per subscriber below today's implementation of GPON by develop innovative new low cost components with high level of integration in addition to new manufacturing processes. Even the cheapes WDM-PON solution cost 2 -3 times as much as GPON. Up to 95% of the cost of optical components is due to packaging. The project aims to develop a systm with a integration scale that is around 100 times higher than SOA that can be implemented as an upgrade of xPON systems, that are currently being installed, and will not require changes or re-routing of optical fibres.<br/>The European citizens and society will benefit from GigaWAM through: Easier access to a broad range of services; online maintaining communication links, avoiding discrimination and exclusion, benefit regarding telemedicine and eHealth, e-learning, and bridge the gap between urban and rural areas and Eastern and Western Europe.<br/>Overall, the market opportunity in year 5 post market launches is €230 Mn annually with market launch in Europe, Asia and US assuming a conservative market penetration the first years followed by a steeper growth to 5% market penetration in Europe in year 5.

Consortium · 13 organisations

coordinator

THE UK INTELLIGENT SYSTEMS RESEARCH INSTITUTE LIMITED

UK

participant

Nor-Tek Teknologisenter AS

NO · €475,222

participant

AIFOTEC FIBEROPTICS GMBH

DE

participant

FRAUNHOFER GESELLSCHAFT ZUR FORDERUNG DER ANGEWANDTEN FORSCHUNG EV

DE · €203,232

participant

IGNIS PHOTONYX A/S

DK · €972,660

participant

FICONTEC GMBH

DE · €19,854

participant

ERICSSON AB

SE · €44,179

participant

IGNIS PHOTONYX INC

CA

participant

Finisar Sweden AB

SE · €416,475

participant

DANMARKS TEKNISKE UNIVERSITET

DK · €262,217

participant

SVEDICE AB

SE · €201,837

participant

AIFOTEC AG

DE · €126,927

participant

VERTILAS GMBH

DE · €277,397

Research fields

View the official record on CORDIS →

← Find collaborators and more funded projects

Source: CORDIS, Publications Office of the European Union. Global Research Partnerships surfaces open EU research data to help you find collaborators; we are not affiliated with the European Union.