Founding offer · lifetime membership for a single £24, exclusive to our first members · closes 20 June Claim your place →
Global Research Partnerships £24 Lifetime Log inCreate free account

Funded Projects › H2020

FloatMastBlue · Offshore Wind Energy Cost Reduction by an Innovative Floating Met Mast Platform

H2020Status: CLOSED1 December 201731 July 2021EU funding €2,048,568Call H2020-SMEInst-2016-2017

FloatMast is a floating platform that performs the best wind data measurements for the most promising and advanced Blue Energy activity, Offshore Wind Parks (OWPs). These wind measurements are vital for the cost benefit analysis of OWPs as they are used in the estimation of the annual income. Moreover, the wind measurements are also critical to the definition of the Operation and Maintenance costs as they are used in the design specification of the OWP’s turbines, towers and foundations. The wind measurements collected by FloatMast are according to the highest industry standard (IEC 61400-12-1) and provide the greatest net benefit to the Developers of OWPs. It can perform wind measurements at a 70% lower cost, by combining the best features from the two existing solutions: the meteorological mast and the Lidar remote sensor device on a stable floating platform. Furthermore, it is re-usable and provides the added value of being re-deployed in other locations of interest. It can be used at all stages of the life cycle of the OWP, from the design phase to the development and operational phase and until the decommissioning phase, twenty years later. Moreover, the platform can perform multi-purpose measurements as it can incorporate oceanographic instruments and environmental sensors, providing a fully integrated solution for a complete monitoring of the OWP site. The innovation has been developed by two Greek SMEs, it has been patented and certified, tested in a tank test at a 1:25 scale model, constructed at 1:1 physical scale, launched to the sea and conducted a series of tests with perfect compliance. The design and hydrodynamic behavior of the platform have been proven and the next stage involves enhancements and upgrades. Finally, the platform must undergo a demonstration phase in the operational environment in order to provide the needed verification of its operational capabilities and advance the already 2,3 m Euros investment to the commercialization phase.

Consortium · 3 organisations

coordinator

ETME PEPPAS KAI SYNERGATES EE

EL · €1,059,824

participant

STREAMLINED SYMVOULI MECHANIKI EPE

EL · €988,744

thirdParty

FLOATMAST LTD

UK

Research fields

View the official record on CORDIS →

← Find collaborators and more funded projects

Source: CORDIS, Publications Office of the European Union. Global Research Partnerships surfaces open EU research data to help you find collaborators; we are not affiliated with the European Union.