Founding offer · lifetime membership for a single £24, exclusive to our first members · closes 20 June Claim your place →
Global Research Partnerships £24 Lifetime Log inCreate free account

Funded Projects › FP7

ESTORAGE · Solution for cost-effective integration of renewable intermittent generation by demonstrating the feasibility of flexible large-scale energy storage with innovative market and grid control approach

FP7Status: CLOSED1 October 201230 September 2017EU funding €13,314,588

The objective of eStorage is to develop cost-effective solutions for the widespread deployment of flexible, reliable, GWh-scale storage across EU, and to enhance grid management systems to allow the integration of large share of renewable.The key issue we plan to address is the need for power regulation during low demand periods, when only inflexible baseload generation and intermittent renewable generation are operating. In contrast to conventional generation, a storage plant able to regulate its consumption could help to avoid curtailing wind.Conventional Pumped Storage Hydro Plants (PSP) can only regulate their power in generation mode; variable speed technology for PSP can bring the additional flexibility in pumping mode as well. Developing technically and economically feasible solutions in eStorage will allow upgrading a significant part of European PSP capacity to variable speed, providing up to 10 GW of additional regulation capability with no environmental impact and little administrative burden, all at a much lower cost than developing new plants.We will also develop and demonstrate solutions for coupling the dispatch of storage plants with renewable generation using advances Energy Management Systems. This will enable storage plants to maximise their value in the balancing markets.. From simulation studies, demonstration results and storage potential analysis we will evaluate the system-level benefits of storage and identify development barriers in order to draw recommendations for efficient market and regulatory framework to maximise the impact of project outcomes.eStorage gathers major stakeholders from the entire value chain across EU (Elia – TSO, EDF – Generation Company, Imperial College – Academic Institution, Kema – Engineering Consultancy and Alstom – Equipment Manufacturer).

Consortium · 7 organisations

coordinator

GE HYDRO FRANCE

FR

participant

IMPERIAL COLLEGE OF SCIENCE TECHNOLOGY AND MEDICINE

UK

participant

ELECTRICITE DE FRANCE

FR

participant

GRID SOLUTIONS SAS

FR

participant

KEMA NEDERLAND BV

NL

participant

ELIA SYSTEM OPERATOR

BE

participant

ALGOE SA

FR

View the official record on CORDIS →

← Find collaborators and more funded projects

Source: CORDIS, Publications Office of the European Union. Global Research Partnerships surfaces open EU research data to help you find collaborators; we are not affiliated with the European Union.