Founding offer · lifetime membership for a single £24, exclusive to our first members · closes 20 June Claim your place →
Global Research Partnerships £24 Lifetime Log inCreate free account

Funded Projects › FP7

eBADGE · Development of Novel ICT tools for integrated Balancing Market Enabling Aggregated Demand Response and Distributed Generation Capacity

FP7Status: CLOSED1 October 201230 November 2015EU funding €3,147,022

The 3rd Energy Package clearly boosts the development of an Integrated European balancing mechanism. In this context, ACER has in 2011 started the development of the Framework Guidelines on Electricity Balancing.It is expected from the ACER statements that Demand Response will play significant role in the future integrated balancing market allowing Virtual Power Plants, comprising Demand Response and Distributed Generation resources to compete on equal ground.Based on the above, the overall objective of the eBADGE project is to propose an optimal pan-European Intelligent Balancing mechanism, piloted on the borders of Austria, Italy and Slovenia, that is also able to integrate Virtual Power Plant Systems that can assist in the management of the electricity Transmission and Distribution grids in an optimized, controlled and secure manner. Even if the trans-national mechanism proposed by eBADGE will be tested with reference to a trilateral case (Austria, Italy, Slovenia), the approach and the modelling methodology is meant to allow a gradual extension to other countries in Europe (such as Germany in a second phase).The ICT development of the eBADGE project will be in line with the ACER Guidelines delivering the following five results:•\tSimulation and modelling tool for studying Integrated Balancing/Reserve Market allowing the participation of VPP at the distribution side;•\tUniform high performance message bus between Balancing/Reserve entities;•\tBusiness models between Energy, ICT and Residential Consumers sectors;•\tVirtual Power Plant as a Reliable Balancing Asset;•\tPilot eBADGE Cloud.Project objectives are:1.\tTo develop the components: simulation and modelling tool; message bus; VPP data analysis, optimisation and control strategies; home energy cloud; and business models between Energy, ICT and Residential Consumers sector;2.\tTo integrate the above components into a single system;3.\tTo validate these in lab and field trials;4.\tTo evaluate its impact.The Consortium will first design and implement the single components, which will be then individually tested and validated and finally, integrated. The validation of the individual components will be done using historical data and simulation (Simulation and modelling tool), expert knowledge in the Consortium (Message bus validation) using designed and developed scenarios and field trials (Home Energy Cloud and Pilot eBADGE cloud). The validation of the selected models for an Integrated Balancing/Reserve Market will also bring to a first rough assessment of the environmental and economic benefits.The consortium will promote a strong interaction and consultation with relevant stakeholders involved in Advisory Board. Achievements of the project eBADGE, if widely implemented, will also deliver synergies and efficient use of existing resources and infrastructure thus lowering daily costs for electricity users and increasing European welfare.

Consortium · 13 organisations

coordinator

TELEKOM SLOVENIJE DD

SI · €412,120

participant

TECHNISCHE UNIVERSITAET WIEN

AT · €260,800

participant

EUDT ENERGIE- U. UMWELTDATEN TREUHAND GMBH

AT · €186,000

participant

BORZEN, OPERATER TRGA Z ELEKTRIKO,D.O.O.

SI · €56,700

participant

ELEKTRO LJUBLJANA PODJETJE ZADISTRIBUCIJO ELEKTRICNE ENERGIJE D.D.

SI · €174,270

participant

AIT AUSTRIAN INSTITUTE OF TECHNOLOGY GMBH

AT · €249,750

participant

XLAB RAZVOJ PROGRAMSKE OPREME IN SVETOVANJE DOO

SI · €414,708

participant

CYBERGRID GMBH

AT · €69,751

participant

SAP SE

DE · €264,744

participant

VAASAETT LTD AB OY

FI · €179,200

participant

AUSTRIAN POWER GRID AG

AT · €102,000

participant

RICERCA SUL SISTEMA ENERGETICO - RSE SPA

IT · €376,230

participant

ELES DOO OPERATER KOMBINIRANEGA PRENOSNEGA IN DISTRIBUCIJSKEGA ELEKTROENERGETSKEGA OMREZJA

SI · €73,800

Research fields

View the official record on CORDIS →

← Find collaborators and more funded projects

Source: CORDIS, Publications Office of the European Union. Global Research Partnerships surfaces open EU research data to help you find collaborators; we are not affiliated with the European Union.